Foundation installation in College Station TX - a base built for the soil under it
Got a lot, a set of plans and clay that moves? We build the foundation for that soil, straight and square.

Foundation installation sets the whole house. Get the ground right first.
Foundation installation in College Station, TX means building the base your house rests on. A well-built one holds up against the soil swelling and shrinking under it, or spans over that movement, and keeps its top close to level. For a porch or a small addition, the job may be concrete footings instead.
The big decision is the type. Foundation guidance from the Houston area finds that damage risk tends to rise as cost falls, and that shallow systems usually carry more risk than deep ones. Plenty of owners pick shallow to save money, so I walk you through that trade, a cheaper foundation now against more movement later, before you choose.
Price moves with the foundation type, the size of the footprint, what the soil and the design call for, and how much fill the lot needs. The schedule mostly turns on the permit and the inspections. We're licensed and insured, we pull the permit when the job needs one, and I write the estimate myself.
When do you need foundation installation? Usually before anything else.
A lot and a set of plans
Nothing goes up until the foundation does, and the framer can't start without it. Calling early leaves room to sort out the soil and the design before anyone's waiting on the pour.
A room going on the back
An addition needs its own base that ties into the house without pulling away from it. When that part gets rushed, the joint between old and new is usually where the first crack shows.
Wide cracks in the yard
Dirt that splits open in a dry summer and turns sticky after rain is clay that moves a lot. A foundation has to be built for that ground, because ignoring it costs you later.
Foundation installation starts with a visit. I come out myself.
You call, and I come out to look at the lot, measure and ask what the foundation has to carry, whether that's a house, an addition, or a building with a concrete parking lot going in beside it.
You get a written estimate. If you go ahead, we handle the permit, set the forms and the rebar, the steel that holds the concrete together, and wait on the city. In College Station each inspection has to be approved before the next phase starts, and on a new house the foundation inspection comes right after the plumbing rough-in, the pipes set before the pour.
Once it passes, we call the truck and pour. Then we cure it right, keeping it damp so it gains strength instead of drying out weak on top. Our crew cleans up, I walk it with you and tell you when it's ready to build on.

Planning a foundation installation? Tell us about the lot.
Send the lot address and any plans or soil report, and we'll reply within one business day to set up a free, written estimate on site, with no obligation.
(979) 393-7025Foundation installation around College Station. Same work, different offices.
In College Station, the city's Building Official can ask for a form survey before any concrete goes in, done by a Texas-licensed surveyor to show the house sits inside its setbacks, how far it has to stay from the property lines. The city has also proposed that slabs poured deeper at the edges meet a foundation standard written for this area. We do the same work in Bryan and Navasota, and check with the office that covers the address first.
Foundation questions, answered plainly. Call if yours isn't here.
Read through the answers below. If your question isn't covered, call (979) 393-7025 and ask me directly.
What type of foundation works best on clay soil in College Station?
A structural slab built over void forms usually moves least, while a regular slab poured on the ground should be expected to shift some. Void forms leave a gap under the floor, so swelling clay has room to move without pushing on the slab, as long as that gap stays big enough.
Do I need a permit to build a foundation in College Station?
Yes. The city says a building permit should be issued before work starts on a new structure, a remodel or a renovation, and contractors have to register with the city before they can get one. That's our job, though if you own the home and live in it, the city also lets you get the permit yourself without registering.
Does an engineer have to design my house foundation in Texas?
Texas law puts foundation design on an engineer unless the work falls under one of the law's exemptions. Ask early whether yours is exempt, since it decides who draws the plans. Either way, ask whether a geotechnical investigation, a study of the soil, backs the design, because I'd rather work from a soil report than a guess.
Will a new concrete foundation crack like the old one did?
Probably some, because concrete cracks, and that's about the one thing you can count on it to do. What we control is the part underneath. We dig out and pack the subgrade, the dirt the slab sits on, instead of raking it level, and set rebar to hold the concrete together if it does crack.
How do I take care of a new foundation on clay soil?
Keep the soil around it at a fairly even moisture level all year. Extension guidance written for another Texas county says that in long dry spells, that means watering evenly and often around the whole foundation. Clay swells as it gets wetter and shrinks as it dries, so uneven watering is how one side ends up moving more than the other.
Building on College Station clay? Call BD College Station Concrete Construction.
Call (979) 393-7025 while the design can still change, give me the lot address and what's going on it, and I'll set a time to come look.
Mon–Fri: 6 AM–9 PM, Sat–Sun: 7 AM–9 PM